Your house in Croatia,from idea tobuilding permit.
We design family houses and residential buildings in a full 3D BIM model and handle all the paperwork for the permit. Even if you live in Germany, Austria or anywhere else abroad.
- building permits every year
- 50+
- year the company was founded
- 1997
Services
Family house designFrom the first sketch to the building permit, with a full 3D BIM model and all the paperwork.
Residential building designApartment buildings for investors and families, with layouts buyers want and residents love.
Realistic 3D visualisationSee the house or building before it is built, in daylight, at dusk and from the air.
Construction cost estimate for loansA cost estimate your bank accepts, built from the real quantities of your design.
LegalisationAs built survey and handling of the procedure, so your building is in order on paper.
Plot checkA written report on what you may build on a plot, before you buy it.
Projects
- Under construction

Residential building Kolonija, Slavonski Brod
Design · 2027 · P+2 · 284.20 m²
- Built

Residential building Sajmište, Vukovar
Construction supervision · 2014 · P+2+Pk · 1,214.87 m²
- Under construction

Family house Jagnjić Dol, Sveta Nedelja
Design · 2027 · P+1 · 220.77 m²
- Built

Family house Naselje hrvatskih branitelja, Slavonski Brod
Design · 2015 · Po+P+Pk · 295.24 m²
- Built

Family house Naselje Zrinski-Frankopan, Slavonski Brod
Design · 2012 · Po+P+1 · 258.04 m²
How we design a family house
1 working day
Plot and quote
We check what the plot allows, talk about your wishes and send a quote.
2–3 weeks
3D design and documents
We develop the house in a 3D model and refine it with you until you approve it, then produce the concept design from the model. The survey arrives in parallel.
4 weeks*
Utility conditions
Through the eDozvola system we request the connection conditions for the public utilities. As soon as they arrive, we submit the building permit application through eDozvola.
4–8 weeks*
Main design
While the building authority processes the building permit application, we prepare the main design of all disciplines. It is filed with the notice of start of works.
*Typical durations from our practice. How long the permit takes depends on the local office.
From plot to building permitFrequently asked questions
Can I build a house in Croatia while living abroad?
Yes, and you do not need to travel. We agree the whole design through video calls, email, WhatsApp and Viber, and sign the contract digitally. For the permit we only need your power of attorney, certified by a notary or at a Croatian consulate.
Do you handle the building permit paperwork?
Yes. We coordinate the surveyor and engineers, collect the attachments and submit the application through the eDozvola system.
Do you work in English and German?
We talk and meet online in Croatian or English. In writing, by email or message, we are happy to use German as well.
How much does a house design cost?
It depends on the size and complexity of the project. Send us the basics and we will send you a quote with no obligation. Request a quote →
